Work Week 2025 Work week 2025 began on May 24th and lasted through May 31th with Steve and Yolie and Mica and Whittle (and Lulu) staying longer. Here are some of the things we accomplished: 520’ of Water line to 7 faucets New Sheetrock ceiling in Dibs room. 2 New outlets in Dib’s and one in middle bath Three circuits into box on ceiling in guest house, one for future use, one to outlets in Adeline’s room and Dib’s and ceiling fan in Dib’s, and one to new can lights in Dib’s room. Colton put in top rock step to the lower level by the desert willow. We cut and repaired the fiber line, again. Connie and Yolie replaced one window, screan in tuck’s room. Whittle and Colton reinforce the roof over Dib’s room. Whittle and others put new facing on the gable at Truck’s room Matt D and Elliott put extra insulation above Adaline‘s room in the middle bathroom. Colton fixed the rope to the bell. Matt B. Wired 3 outlets in the barn and the can lights in dibs room. Steve planted 2 Shademaster honey locust trees. Colton put in 500 hundred feet of trenches to run new water line for spickets. We branded 96 calves. Flanked 38 We ate a lot of good food!!! [/vc_